TAA Compliance: Flex Matrix Series

TAA Compliance: Flex Matrix Series

What is TAA?

The Trade Agreements Act (TAA) is a U.S. federal law that requires products purchased by the U.S. government and certain federally funded institutions to be manufactured or substantially transformed in a TAA-designated country. TAA-designated countries include the United States and most U.S. trade partner nations — notably excluding China and several other countries.

TAA compliance is a procurement requirement for:

  • U.S. federal government agencies (GSA schedules, DoD contracts)
  • State and local government agencies using federal funding
  • K–12 schools and universities receiving federal grants (E-Rate, CARES Act, etc.)
  • Healthcare organizations receiving Medicare/Medicaid funding
  • Any entity purchasing under a GSA Schedule contract

FLEX Matrix TAA Compliance Status

The KanexPro FLEX Matrix series — chassis and card SKUs — are TAA compliant. All FLEX Matrix products are manufactured or substantially transformed in TAA-designated countries, making them eligible for U.S. government and federally funded procurement.

TAA-Compliant FLEX SKUs

SKUDescriptionTAA Status
FLEX-MF8X108×10 Modular Matrix Chassis✅ TAA Compliant
FLEX-MF16X2016×20 Modular Matrix Chassis✅ TAA Compliant
FLEX-MF24X3624×36 Modular Matrix Chassis✅ TAA Compliant
FLEX-MF24X6024×60 Modular Matrix Chassis✅ TAA Compliant
FLEX-HDMI8IN8-Port HDMI Input Card✅ TAA Compliant
FLEX-HDMI12OUT12-Port HDMI Output Card✅ TAA Compliant
FLEX-CAT12OUT12-Port CATx Output Card✅ TAA Compliant
FLEX-CATRXHDBaseT CAT Receiver✅ TAA Compliant

Why TAA Matters for AV Procurement

Government and education AV projects frequently require TAA-compliant products. Specifying non-compliant products — even inadvertently — can result in bid disqualification, contract violations, or the need to replace installed equipment. The FLEX Matrix’s TAA compliance allows it to be specified on:

  • GSA Schedule 70 / Schedule IT purchases
  • NASA SEWP contracts
  • DoD and military installations
  • State government cooperative purchasing agreements
  • E-Rate funded school and library AV projects
  • Higher education AV infrastructure funded by federal grants

Requesting TAA Documentation

For TAA compliance letters, country of origin documentation, or GSA Schedule pricing, contact KanexPro at sales@kanexpro.com or 888.975.1368. Reference the specific SKU(s) required for your procurement package.

Related Articles

    • Related Articles

    • Troubleshooting & FAQ: Flex Matrix

      Troubleshooting No Signal on a Specific Output Verify the output card is fully seated in the chassis slot. Remove and reseat if necessary. Confirm the correct input is routed to that output via the web GUI or RS-232. Check the HDMI or CATx cable. ...
    • Getting Started: Flex Matrix Overview

      What is the FLEX Matrix? The KanexPro FLEX Matrix is a modular 4K60 matrix switcher — a single chassis that routes any HDMI source to any display, at any scale, with built-in video wall, quad view multiview, per-output independent scaling, and CEC ...
    • White Paper: Modular vs. Fixed Matrix — Part 1: Architecture, Scalability, I/O Flexibility, Feature Depth & TAA

      White Paper — Part 1 of 2 Modular vs. Fixed Matrix Architecture Architecture, Scalability, I/O Flexibility, Feature Depth & TAA Compliance Executive Summary When specifying an AV matrix switcher, integrators and end users face a choice that extends ...
    • Product Guide: Flex Chassis

      Overview The FLEX Matrix chassis is the core switching engine of the FLEX modular matrix system. Each chassis accepts FLEX input and output cards to build a custom I/O configuration — from a compact 8×10 matrix up to a 24×60 high-density matrix — all ...
    • White Paper: Modular vs. Fixed Matrix — Part 2: TCO Analysis, Deployment Scenarios & Conclusion

      White Paper — Part 2 of 2 Modular vs. Fixed Matrix Architecture TCO Analysis, Deployment Scenarios & Conclusion Continued from Part 1: architecture definitions, scalability, I/O flexibility, feature depth, and TAA compliance. 6. Total Cost of ...